Our case study comparisons between Traditional Tiling and the STS Panel showcase the benefits of our Tiling Technology and Process in terms of Overall Tiling Time, Onsite Work Requirements and Waterproofing & Drying Time showcases 

Over all Tiling Time Comparison

Project Type 
G + 8 Building
Tiling Area 
20,000 sqm
Total Team
4 (1S+2T)
Total Size 
40 x 40
Tiling with STS Panel 
Time Per Floor
Time to Finish 8 Floors 
Traditional Tiling 
Tradition Tiling 1.png
5 Days 
35 Days
sts panel comp1.png
Time Per Floor
1.5 Days
Time to Finish 8 Floors 
12 Days

Onsite Work Requirements

Traditional Tiling 
ONSITE CUTTING_1.png
Hole Making

MESSY HEALTH HAZARD

ONSITE CUTTING_2.png
Tiles Cutting
On-site drilling work poses health hazards and creates a significant mess, generating dust and debris that contaminate the environment. This airborne particulate matter from tiles and mortar can lead to respiratory issues for workers and also necessitates extensive cleaning
Tiling with STS Panel 
ONSITE STS CUTTING_1.jpg
Hole Making

CLEAN

ONSITE STS CUTTING_2.jpg
Tiles Cutting
The STS Panels are precut and prepared off-site, expediting on-site installation and improving worker safety standards. This off-site preparation ensures panels arrive ready for installation, reducing time and labor significantly.

Waterproofing & Drying Time

Traditional Tiling 
waterproofing 1.png
Waterproofing
waterproofing 2.png
Drying Time
Water Based
Solvent Based
Epoxy Based
48 Hrs
24 Hrs
72 Hrs
Traditional manual waterproofing is a laborious and time-consuming process, demanding meticulous application of materials prone to human error. This method, requiring extensive preparation and drying time, can delay construction progress and, if not executed precisely, may result in future leaks and water damage
Tiling with STS Panel 
sts waterproofing 1.png
Waterproofing
sts waterproofing 2.png
Drying Time
With the STS Panel there is no drying time required regardless of Component. The tiles are ready to be walked on and cleaned 
The STS Panel provides a superior alternative by integrating waterproofing directly into its design. Produced in a controlled environment to the highest standards, each panel guarantees reliable waterproofing without the mess, risk, and time of manual application. This makes the STS Panel a more efficient, cleaner, safer, and reliable choice for modern construction needs